admin

August 23, 2019

St. Andrew Catholic Elementary School

In 2019, Renokrew worked alongside AECOM and SAB Engineering on the 6500 square foot interior and exterior renovations and modifications to the existing St. Andrew Catholic […]
August 14, 2019

Our Lady of The Rosary Parish

In early 2019, Renokrew worked alongside RZ Interiors on the interior renovation/restoration of Our Lady of The Rosary Parish. Our Lady of The Rosary Parish is […]
February 8, 2019

York University

Renokrew worked alongside LGA Architecture and V&R Engineering on the 8,500 square foot renovation to the existing 5th floor DLLL Department at York University. The project […]
January 27, 2019

The Town of Grimsby Operations Centre

The Town of Grimsby Operations Centre Expansion project is composed of a 12,000 square foot building expansion. Three additions to the existing building including Industrial Bays, […]
March 21, 2018

St. Wilfrid’s R.C. Parish

This project consisted of a major renovation and the construction of a new three-storey elevator shaft and the delivery and commissioning of a new Limited Usage […]
March 21, 2018

St. Augustine of Canterbury R.C. Parish

Renokrew worked along side Nino Rico from Nino Rico Architecture and McIntosh Perry on the Envelope Repairs, Renovations and Site Restoration to the St. Augustine of […]
March 21, 2018

St. Maria Goretti Parish

Renokrew worked along side Morrison Hershfield on the Envelope Repairs and Renovations to the St. Maria Goretti Parish. The project involved the removal of existing pavement, […]
March 14, 2018

Rama Gaming Centre

This 2,500-square- meter facility, was the first of its kind offering Electronic Bingo in Ontario; it replaces the previous building owing to poor indoor air quality […]
March 28, 2017

St. Matthew’s R.C. Parish, Retaining Wall Construction

Renokrew worked along side AFD Designs and Honeycomb Group on the demolition of an existing retaining wall, new retaining wall construction, building foundation repairs and restoration. […]